Allow cost elements to be identified as direct or indirect costs
(6
product(s) support this feature
)
Allow costs to be defined by activity based costing ABC methods
(5
product(s) support this feature
)
Allow costs to be defined by allocation method
(6
product(s) support this feature
)
Allow for overlapping operations or activities by quantity time and percent complete
(8
product(s) support this feature
)
Allow for parallel operations or activities
(8
product(s) support this feature
)
Allow for sequential operations or activities
(8
product(s) support this feature
)
Allow hierarchy of operations and suboperations on MBOM
(8
product(s) support this feature
)
Allow multiple cost elements per activity
(6
product(s) support this feature
)
Alternate operations can be assigned to a material
(7
product(s) support this feature
)
Associate detailed production activities with production operations
(7
product(s) support this feature
)
Associate item specific overrides for production equipment and materials
(6
product(s) support this feature
)
Associate labor and overhead costs to resources
(7
product(s) support this feature
)
Associate location specific overrides for production equipment and materials
(6
product(s) support this feature
)
Associate materials with sequenced production operations
(7
product(s) support this feature
)
Associate MBOM operations with unlimited video document drawings and activities
(8
product(s) support this feature
)
Associate production costs with activities
(6
product(s) support this feature
)
Associate production resources tools labor and other to production operations
(8
product(s) support this feature
)
Available audit or history of all MBOM changes
(8
product(s) support this feature
)
Capture production goals and targets cycle time throughput cost etc
(8
product(s) support this feature
)
Capture production project information scale up plan shift assumptions wage models and outsourcing plans
(8
product(s) support this feature
)
Define production resources and time required by activity
(8
product(s) support this feature
)
Develop process activity maps
(5
product(s) support this feature
)
Develop product structure maps
(6
product(s) support this feature
)
Display graphical view of conceptual production plan
(6
product(s) support this feature
)
Establish high-level relationship between items processes and resources
(8
product(s) support this feature
)
Flag changes to engineering BOM information on MBOM
(8
product(s) support this feature
)
Flag materials not associated with operations or activities
(8
product(s) support this feature
)
Identify conceptual machine workspace and human resources required for production
(7
product(s) support this feature
)
Identify conceptual material transport locations
(6
product(s) support this feature
)
Identify planned inventory buffer locations
(6
product(s) support this feature
)
Identify relationship of materials on charts
(7
product(s) support this feature
)
Identify relationship of production processes on charts to each other and to components
(8
product(s) support this feature
)
Import and access materials from engineering BOM
(8
product(s) support this feature
)
Import or access production information in conceptual process plans
(6
product(s) support this feature
)
Include cost of consumable items tooling gloves etc in cost
(7
product(s) support this feature
)
Include non-value added activities in process plan
(7
product(s) support this feature
)
Multiple operations can be assigned to a material
(8
product(s) support this feature
)
Operations and activities can have revisions
(8
product(s) support this feature
)
Optionally show activities on process charts
(7
product(s) support this feature
)
Provide alternative production costs by location
(7
product(s) support this feature
)
Provide change history for production plan
(5
product(s) support this feature
)
Provide common repository of standard production activities
(7
product(s) support this feature
)
Provide common repository of standard production operations
(7
product(s) support this feature
)
Provide conceptual production plan
(6
product(s) support this feature
)
Provide cost element detail for purchased items including freight tax etc
(7
product(s) support this feature
)
Provide drag and drop editing including addition of materials for MBOM
(7
product(s) support this feature
)
Provide graphical view of MBOM
(7
product(s) support this feature
)
Resources carry multiple rates regular overtime shift rates etc
(7
product(s) support this feature
)
Resources to carry multiple cost elements
(7
product(s) support this feature
)
Roll up activity costs to operations by cost element and summarize by direct or indirect costs
(7
product(s) support this feature
)
Top
Page:
1
2
LOGIN
Username:
Password:
Forgot password
|
Register
GET STARTED HERE
SOFTWARE SELECTION CORNER
Software Selection Process
Pre-solicitation Phase
Solicitation Phase
Selection Phase
Software Selection Process Checklist
Software Selection Tools
Online Software Selection
Software Rating Reports
RFP Templates
Software Evaluation Report
NEW
Software Selection Resources
Decision-Making Societies
ESS Back To Basics
ERP Evaluation
FOSS Evaluation
HRM Evaluation
SCM Evaluation
Technology And Software Terms
Acronym Introduction
Glossary Of Acronyms
Glossary of Terms
10 Most Ambiguous White Paper Buzzwords