Work Order Management Page: 1

Page: 1 2
  1. Able to charge overhead to a particular work order without a special labor rate (26 product(s) support this feature)
  2. Able to create blanket work orders usable on multiple equipment from different cost centers (25 product(s) support this feature)
  3. Able to define approval limits as a range (21 product(s) support this feature)
  4. Able to drag and drop work orders on the graphical schedule (25 product(s) support this feature)
  5. Able to prohibit a user charging dollars to others cost centers (26 product(s) support this feature)
  6. Able to retrieve drawings directly into the CMMS from within the work order screen (26 product(s) support this feature)
  7. Able to select new used or reconditioned parts from within the work order screen (26 product(s) support this feature)
  8. Algorithm that favors the lowest cost (21 product(s) support this feature)
  9. Alternative approvals can be set up (26 product(s) support this feature)
  10. Approval level changes when the WO is in overrun for the cost of total labor-materials booked (22 product(s) support this feature)
  11. Approvals can be defined for status changes for WOs (26 product(s) support this feature)
  12. Approvals can be set up by one of multiple people including auto routing and notification (25 product(s) support this feature)
  13. Avoid distortion of capacity on the schedule (25 product(s) support this feature)
  14. Calendar showing hours available by crew by day (26 product(s) support this feature)
  15. Charge labor to a closed work order (25 product(s) support this feature)
  16. Charge materials to a closed work order (25 product(s) support this feature)
  17. CMMS system can create an invoice to a third party for labor and material used (23 product(s) support this feature)
  18. Contract labor hours can be planned and actuals reported without WO-PO distortion (24 product(s) support this feature)
  19. Contract maintenance can be identified on the schedule (23 product(s) support this feature)
  20. Define shift hours on the work order (28 product(s) support this feature)
  21. Define the default cost center for work orders (28 product(s) support this feature)
  22. Distinction can be made between scheduling and planning (25 product(s) support this feature)
  23. Drawings can be edited from within the work order screen (22 product(s) support this feature)
  24. Drill down on hot spots on the drawing to link to detailed part information (23 product(s) support this feature)
  25. Drill down on standard parts to view nameplate detail from the inventory control module (27 product(s) support this feature)
  26. Explanation is provided to the work request originator if work request is rejected (25 product(s) support this feature)
  27. Five or more levels of work order hierarchy that can be scheduled separately (23 product(s) support this feature)
  28. Flag parts as hazardous material (27 product(s) support this feature)
  29. Flag parts as to critical spares (27 product(s) support this feature)
  30. Graphical schedule showing workload and resource availability (23 product(s) support this feature)
  31. Graphical schedule shows workload capacity (25 product(s) support this feature)
  32. Hot key to a drawing showing standard parts for the asset (26 product(s) support this feature)
  33. If multiple customers are involved third party customers can be provided access to only their information (27 product(s) support this feature)
  34. Labor-material costs can be marked up (26 product(s) support this feature)
  35. Material can be planned and actuals reported without WO-PO distortion (23 product(s) support this feature)
  36. Multiple approvals can be set up where routing is automated (26 product(s) support this feature)
  37. Other costs can be marked up (26 product(s) support this feature)
  38. Other fields are provided to prioritize WOs or equipment used in scheduling (24 product(s) support this feature)
  39. Prevent closing a work order based on asset status (23 product(s) support this feature)
  40. Prevent closing a work order based on work order status (27 product(s) support this feature)
  41. Priorities are combined and used to suggest a schedule (25 product(s) support this feature)
  42. Priorities can be combined in a user-defined manner using Boolean logic (22 product(s) support this feature)
  43. Quantity to be repaired can be blocked from selection (20 product(s) support this feature)
  44. Quantity to be repaired is visible from within the work order screen (23 product(s) support this feature)
  45. Receive parts back into stores as quantity to be repaired (26 product(s) support this feature)
  46. Record final asset disposition status before closing the work order (24 product(s) support this feature)
  47. Reopen a closed work order (23 product(s) support this feature)
  48. Safety tasks-instructions are recorded against work orders (27 product(s) support this feature)
  49. Schedule can display in-process work orders including revised hours by craft to completion (25 product(s) support this feature)
  50. Schedule has resource balancing utilizing planned absences (23 product(s) support this feature)