Preventive Maintenance Page: 1

Page: 1 2
  1. A trigger from one indicator can reset all other triggers (26 product(s) support this feature)
  2. Activity triggers alarm pager or e-mail (24 product(s) support this feature)
  3. Alarm tables for indicators are color coded (24 product(s) support this feature)
  4. Conditions and alarms are visible and distinguished on the graphic (20 product(s) support this feature)
  5. Corrective task times (29 product(s) support this feature)
  6. Establish a PM route for a single asset type across multiple locations (24 product(s) support this feature)
  7. Establish a PM route for multiple assets in a single location (27 product(s) support this feature)
  8. Establish an asset group tying several assets to one or more procedures (27 product(s) support this feature)
  9. Fifty-two week schedule (25 product(s) support this feature)
  10. For a given assessment users can provide inspectors with nominal ie expected value (26 product(s) support this feature)
  11. Generate a route based on Boolean logic surrounding the critical percent (21 product(s) support this feature)
  12. Graphic showing component hierarchy and corresponding indicators (19 product(s) support this feature)
  13. Hot spots on the graphic for drill-down on indicators for further detail (19 product(s) support this feature)
  14. Identify critical percent for each asset-procedure (23 product(s) support this feature)
  15. Labor and material can be charged to an individual asset along the route (24 product(s) support this feature)
  16. Labor and material can be charged using an average cost spread over all assets en route (26 product(s) support this feature)
  17. PM history is used automatically to suggest corrections to future PM scheduled (21 product(s) support this feature)
  18. PM task definitions (25 product(s) support this feature)
  19. PM task times (29 product(s) support this feature)
  20. Priority automatically increases the longer the PM is not done (25 product(s) support this feature)
  21. Problem-cause-action codes can be recorded against individual assets along the route (26 product(s) support this feature)
  22. Readings are validated with a user-defined validation formula (24 product(s) support this feature)
  23. Regression analysis is used to predict the next date for reaching the critical value (19 product(s) support this feature)
  24. Reliability-centered maintenance conditions linked to tasks (25 product(s) support this feature)
  25. Replacement frequency can be tracked for inspection tools (28 product(s) support this feature)
  26. Reroute PMs referencing a GIS locator (25 product(s) support this feature)
  27. Safety checklists and tasks (28 product(s) support this feature)
  28. Standard work order or PM routine will be issued automatically if the critical value is reached (25 product(s) support this feature)
  29. System automatically increases the frequency of inspection if the risk increases (20 product(s) support this feature)
  30. There is a PM master that can show forecasted cycles resulting from choice of frequency (25 product(s) support this feature)
  31. Users can acknowledge an alarm or condition easily from within the graphic screen (19 product(s) support this feature)
  32. Users can combine indicators using Boolean logic to create consolidated or alternate indicators (25 product(s) support this feature)
  33. Users can conduct multiple inspections at multiple points on an asset or infrastructure (25 product(s) support this feature)
  34. Users can define a confidence rating on the risk (23 product(s) support this feature)
  35. Users can define a formula to determine the critical value for inspection readings (25 product(s) support this feature)
  36. Users can define a tolerance percent (23 product(s) support this feature)
  37. Users can define minimum and maximum threshold values for inspection readings (28 product(s) support this feature)
  38. Users can display holidays on the PM schedule (25 product(s) support this feature)
  39. Users can display peak production periods on the PM schedule (22 product(s) support this feature)
  40. Users can display shutdown periods on the PM schedule (26 product(s) support this feature)
  41. Users can ensure there is no build-up of missed PMs (26 product(s) support this feature)
  42. Users can enter a new condition easily from within the graphic screen (18 product(s) support this feature)
  43. Users can establish multiple blackout periods for assets (22 product(s) support this feature)
  44. Users can establish multiple blackout periods for procedures (24 product(s) support this feature)
  45. Users can establish multiple start-stop dates for assets (24 product(s) support this feature)
  46. Users can establish multiple start-stop dates for procedures (25 product(s) support this feature)
  47. Users can establish PM shadowing to avoid duplicate PMs (27 product(s) support this feature)
  48. Users can establish seasonality for a given asset (26 product(s) support this feature)
  49. Users can establish seasonality for a given procedure (25 product(s) support this feature)
  50. Users can forecast when the next meter reading should occur based on historical readings (27 product(s) support this feature)